Short Term Projects:  Information

Greetings, Neighbor!  Thank you for your interest in Juneau’s development.

You may have received a post card referencing you to this page to learn about a project in your area.  On that card is a Case Number in the lower right hand corner.  Find that Case Number below, and click on the “plus” sign for links to more information.

We hope this web page improves communication with our engaged public.  Thank you for your patience while we work out the bugs!  If you have problems or suggestions, please email:  [email protected]

Alternative Residential Subdivision modification to increase surface parking and modify open space.

Changes include:

  • Relocation of Building B northward (away from Glacier Highway).
  • Relocation of some parking in Building B’s previous footprint.
  • Elimination of underground parking in Buildings B, C and D, increasing surface parking.
  • Updated Homeowner Association documents.

SCHEDULE:

Hearing before the Planning Commission on February 27, 2024.

The staff report is anticipated to be posted by February 20, 2024 and can be found here.

Comments received by February 5, 2024 will be included in a staff analysis and forwarded to the Commission.

Comments received between February 6, 2024 and February 23, 2024 at noon will be forwarded to the Commission.

LAST DAY FOR WRITTEN COMMENT:  FEBRUARY 23, 2024 AT NOON

Please send comments to:

[email protected]

[email protected]

PROJECT INFORMATION:

Application

Pre-application Notes

Narrative

Updated Configuration, Phase 1

Updated Configuration, entire development

Updated Homeowner Association documents

Questions?  Please contact:

Irene Gallion, Senior Planner

Irene.Gallion@juneau.gov

(907) 586-0753, extension 4130

A Property Disposal Review for the sale of four (4) CBJ owned lots totaling approximately 10,000 square feet to consolidate in the Juneau Indian Village in a Mixed Use 2 (MU2) zoning district.

SCHEDULE:

Hearing before the Planning Commission on April 23rd, 2024.

The staff report is anticipated to be posted by April 15, 2024, and can be found here.

Comments received by April 1st will be included in a staff analysis and forwarded to the Commission.

Comments received between April 2nd and April 19th, by noon will be forwarded to the Commission.

LAST DAY FOR WRITTEN COMMENT:  April 19th, 2024 AT NOON

Please send comments to:

[email protected]

[email protected] 

PROJECT INFORMATION:

Application

Questions?  Please contact:

Ilsa Lund, Planner I

[email protected] 

(907) 586-0753, extension 4128

Applicants have submitted a Parking Waiver Permit application requesting that the minimum required one (1) parking space be waived for their proposed accessory apartment  (see USE2024 0005) in a D18 zone.

SCHEDULE:

Hearing before the Planning Commission on May 14, 2024.

The staff report is anticipated to be posted by May 6, 2024, and can be found here.

Comments received by April 22, 2024 will be included in a staff analysis and forwarded to the Commission.

Comments received between April 23, 2024 and May 10, 2024, by noon will be forwarded to the Commission.

LAST DAY FOR WRITTEN COMMENT:  May 10, 2024 AT NOON

Please send comments to:

[email protected]

[email protected] 

PROJECT INFORMATION:

Application

Questions?  Please contact:

Ilsa Lund, Planner I

[email protected] 

(907) 586-0753, extension 4128

Applicant requests a final plat review for final plat of Lot 1, Unit Lot A, of Phase 1, Lot 2, and the first length of Seymour Way. Unit Lot A would be the location of a 24-unit multifamily building on approximately 0.23 acres at 7400 Glacier Highway in a D18 Zone.

SCHEDULE:

Hearing before the Planning Commission on April 23, 2024

The staff report is anticipated to be posted by April 15, 2024 and can be found here.

Comments received by April 19, 2024 at noon will be forwarded to the Commission.

LAST DAY FOR WRITTEN COMMENT:  April 19, NOON

Please send comments to:

[email protected]

[email protected]

PROJECT INFORMATION:

Application

Questions? Please contact:

David Peterson, Planner II

[email protected]

(907) 586-0753, extension 4132

The project will go through two parallel processes – the plat process, and the plan process.  Each process has its own naming convention.

Plat (SMP2022 0001)

The plat process creates lots that can then be purchased.  There will be a preliminary plat approval (SMP2022 0001) which will be considered by the Planning Commission at their meeting on December 13, 2022.  Final plat approval will have a project number assignment and be scheduled for the Planning Commission only after the preliminary plat is approved.

Plan (ARF2022 0001)

The plan process allows the Commission to weigh in on design features of the proposed project.  The preliminary plan for this subdivision was approved November 8, 2022 by the Planning Commission. You can find details under ARP2022 0001, above. The preliminary plan that shows how the development will be built.

The construction of the development is proposed in phases, and each phase will require a final plan.  At their meeting on December 13, 2022, the Planning Commission will consider the Final Plan for Phase 1, which would create 96 housing units.  While the preliminary plan showed the general development, the final plans will hone in on the details of development, such as verifying necessary parking, determining snow storage areas, determining location of mail boxes, and determining where trash collection will be.

SCHEDULE:

Hearing before the Planning Commission on December 13, 2022.

The staff report is anticipated to be posted by December 5, 2022 and can be found here.

Comments received by December 9th at noon will be forwarded to the Commission.

LAST DAY FOR WRITTEN COMMENT:  December 9, 2022, NOON (Heading 3)

Please send comments to:

[email protected]

PROJECT INFORMATION:

Plat

Plat

Application

Grading and Drainage Plan

Grading and Drainage Report

Plan

Plan Application

Phasing Plan

Parking Analysis

Open Space Analysis

Final Plan:  Color

Final Plan:  Uses

Final Plan:  Black and White

Homeowners Association Declaration – DRAFT

Traffic Impact Analysis

Questions?

For subdivision questions (SMP2022 0001) please contact:

David Peterson, Plat Review Planner

[email protected]

(907) 586-0753, extension 4132

For plan questions (ARF2022 0001) please contact:

Irene Gallion, Senior Planner

[email protected]

(907) 586-0753, extension 4130

The applicants are proposing the Phase 3 subdivision of Chilkat Vistas Tract A2 in to 19 single family dwellings, and two (2) large tracts. The Single-family lots, range in size from 6,844 square feet and 8,993 square feet. Proposed Tract A2A to the North of the property is 751,006 square feet, and proposed Tract A2B is 57,055 square feet.

SCHEDULE:

Hearing before the Planning Commission on March 26th, 2024.

The staff report is anticipated to be posted by March 18th, and can be found here.

Comments received by March 22nd, at noon will be forwarded to the Commission.

LAST DAY FOR WRITTEN COMMENT:  March 22nd, NOON

Please send comments to:

[email protected]

Application

For subdivision questions (SMP2023 0001) please contact:

David Peterson, Plat Review Planner

[email protected]

(907) 586-0753, extension 4132

Preliminary Plat has been submitted for consideration and public hearing by the Planning Commission for a Subdivision of Lot 3, Black Bear Subdivision. A 10 lot subdivision consisting of (4) Lot Private Shared Access Subdivision, (3) Panhandle Lots, and (3) Standard Lots.

SCHEDULE:

Hearing before the Planning Commission on May 14, 2024.

The staff report is anticipated to be posted by May 6, 2024 and can be found here.

Comments received by April 22, 2024 will be included in a staff analysis and forwarded to the Commission.

Comments received between April 23, 2024 and May 10, 2024, at noon will be forwarded to the Commission.

LAST DAY FOR WRITTEN COMMENT:  May 10, 2024, NOON

Please send comments to:

[email protected]

Application

Questions? Please contact:

David Peterson, Planner II

[email protected]

(907) 586-0753, extension 4132

Mixed use development:  Up to 50,000 square feet of retail and related uses, underground bus staging and vehicle parking, and a park.  Includes floating steel dock up to 70 feet wide and 500 feet long.

SCHEDULE:

Hearing before the Planning Commission on July 11, 2023.

The staff report is anticipated to be posted by March 6, 2023 and can be found here.

Comments received by June 26, 2023 will be included in a staff analysis and forwarded to the Commission.

Comments received between June 27, 2023 and July 7, 2023 at noon will be forwarded to the Commission.

LAST DAY FOR WRITTEN COMMENT:  July 7, 2023 at NOON

Please send comments to:

[email protected]

[email protected]

PROJECT INFORMATION:

Application Elements:

Application Paperwork

Written Summary

Site Plans

Renderings

Traffic Impact Analysis

RESOURCES

The documents below provide context on cruise ship tourism in Juneau.

Long Range Waterfront Plan, Amendment: This document was written specifically to condition a dock development at the subport.

Long Range Waterfront Plan, Subarea B: This section of the Long Range Watefront Plan is specific to development in the subport area.

City Attorney Limiting visitors:  This memo from the City Attorney outlines the legal challenges to limiting visitors.

State of the Visitor Industry:  This is a presentation that the Tourism Manager made to the Assembly Committee of the Whole on April 3, 2023.  The video is poor, so the slide deck she refers to is linked below.

YouTube Link:

Start watching the video at time stamp 1:17:40

Slide Deck

Support Documents

PAST CBJ PUBLIC PROCESS TIMELINE

When available, meeting materials are linked through the date of the meeting.  Note that meeting materials are prepared before the meeting, so may not have the same date as the meeting at which they are presented.

2019

September 9 (no linked materials): Norwegian Cruise Lines purchase the subport for $20 million.

2021

February 11: Process for the NCL dock proposal:  CBJ amends the waterfront plan, applicant pursues a Conditional Use Permit, and then CBJ considers leasing tidelands to the applicant.

March 15:  An update from NCLH on Juneau Waterfront Design, including proposed dock location, berthing management, and amenities.

April 12: Suggestion that the Long Range Waterfront Plan be amended to accommodate the NCL proposal, rather than the plan rewritten.

June 14:  Consideration of a $2 million donation from Norwegian Cruise Lines.  The Assembly decided not to accept the donation.  Discussion revolved around the apparent conflict in light of dock development discussions.

July 19: The Lands, Housing and Economic Development Committee (LHED) forwarded a motion of support for the Assembly for the Manager to negotiation with Norwegian Cruise Lines on a tidelands lease.

August 2: Referencing materials provided at the February 11, 2021 meeting and the 7/19/2021 LHED meeting, the Assembly passed a motion of support for the Manager to work with Norwegian Cruise Lines on a tidelands lease.

2022

January 10: Long Range Waterfront Plan amendment public meeting.  Established Appendix B as framework for development of the subport area.  Clarified that the Conditional Use Permit process would be used for regulatory analysis, and the land lease would provide a vehicle for political decisions.

January 24: Long Range Waterfront Plan amendment update to the Assembly Committee of the Whole.

February 7 (no linked materials):  Long Range Waterfront Plan changes introduced.

February 28: Public testimony taken on the ordinance amending the Long Range Waterfront Plan.

March 14:  Long Range Waterfront Plan amended to allow a fifth cruise ship dock in the subport area.

August 24 (no linked materials):  Norwegian Cruise Line transfers property to Huna Totem.

2023

January 30: Manager request for $200,000 to proceed with cruise ship dock planning.

Questions?  Please contact:

Irene Gallion, Senior Planner

[email protected]

(907) 586-0753, extension 4130

Gastineau Lodge Apartments, LLC is requesting Conditional Use Permit approval to create a six-story, 72-unit multi-family structure in a Mapped Moderate Landslide and Avalanche Hazard Area on Gastineau Avenue.

SCHEDULE:

Hearing before the Planning Commission on October 24, 2023. CONTINUED TO THE DECEMBER 12, 2023 PC. 

The staff report is anticipated to be posted by December 4, 2023, and can be found here.

Comments received by November 20, 2023, will be included in a staff analysis and forwarded to the Commission.

Comments received between November 21, 2023 and December 8, 2023, at noon will be forwarded to the Commission.

LAST DAY FOR WRITTEN COMMENT:  DECEMBER 8, 2023, NOON

Please send comments to:

[email protected]

[email protected]

PROJECT INFORMATION:

Gastinuea Lodge Apartments aerial view

Application for USE2023 0008.

Questions?  Please contact:

Jennifer Shields, Planner II

[email protected]

(907) 586-0753, extension 4139

Eaglecrest Ski Area is applying for a City Project Review & Conditional Use Permit (concurrently) to develop a number of amenities, including the following:

  • Gondola with base station, upper station, and supporting structures
  • “Summit House” warming hut at the gondola’s upper station, with a small snack bar, bathrooms, beer and wine bar, gift shop, and ski patrol station
  • Construction access roads
  • Mountain bike trails
  • Two Upper Fish Creek bridge crossings (each approx. 40 feet in length)
  • Picnic pavilion near Cropley Lake
  • Snow tubing park

PSA – 2.8.2023

Please see the attached applications and supporting information for more detailed information.

Schedule:

Hearing before the Planning Commission on February 27, 2024.

The staff report is anticipated to be posted by February 19, 2024, and can be found here.

Comments received by February 5, 2024, will be included in a staff analysis and forwarded to the Commission.

Comments received between February 6, 2024 and February 23, 2024 at Noon will be forwarded to the Commission.

LAST DAY FOR WRITTEN COMMENT:  February 23, 2024 at NOON (Heading 3)

Please send comments to:

[email protected]

PROJECT INFORMATION:

Planned Development for Eaglecrest Ski Area

APPLICATIONS CSP23-01 & USE23-09

Questions?  Please contact:

Jennifer Shields, Planner II

[email protected]

(907) 586-0753, extension 4139

An application has been submitted for consideration and public hearing by the Planning Commission for a Conditional Use Permit for the construction of a new single-family dwelling with an accessory apartment on a substandard lot in a D5 zoning district.

Applicant: Douglas & Cherry Eckland

Location: 5th Street Douglas AK, 99824

SCHEDULE:

Hearing before the Planning Commission on December 12, 2023.

The staff report is anticipated to be posted by December 4, 2023 and can be found here.

Comments received by November 20, 2023 will be included in a staff analysis and forwarded to the Commission.

Comments received between November 21, 2023 and December 8, 2023 at noon will be forwarded to the Commission.

LAST DAY FOR WRITTEN COMMENT:  DECEMBER 8, AT NOON

Please send comments to:

[email protected]

PROJECT INFORMATION:

Application

Eckland Residence-Drawing Set Modified 8.10.23 (Plans)

Hillside Endorsement 11.1.2023 (Geotech Memo)

Questions?  Please contact:

Emily Suarez, Planner II

[email protected]

(907) 586-0753, extension 4131

Conditional Use Permit request for approval to construct a new 8,900 square foot Food Securities building on a 5.4-acre lot in an Industrial zoning district. The building will include a commercial kitchen for food processing, cooking, and preparation in support of CCTHITA’s catering business.

Location: 1721 Anka Street

Applicant: Central Council of the Tlingit and Haida Indian Tribes of Alaska (CCTHITA)

SCHEDULE:

Hearing before the Planning Commission on December 12, 2023.

The staff report is anticipated to be posted by December 4, 2023, and can be found here.

Comments received by November 20, 2023, will be included in a staff analysis and forwarded to the Commission.

Comments received between November 21, 2023, and December 8, 2023, at Noon will be forwarded to the Commission.

LAST DAY FOR WRITTEN COMMENT:  DECEMBER 8TH, NOON

Please send comments to:

[email protected]

PROJECT INFORMATION:

Application

Questions?  Please contact:

Jennifer Shields, Planner II

[email protected]

(907) 586-0753, extension 4139

Conditional Use Permit and Parking Waiver for a 3,657 square foot Domino’s Pizza Drive Through Restaurant

Location: Clinton Drive

Applicant: R & S Construction LLC

SCHEDULE:

Hearing before the Planning Commission on January 23, 2024.

The staff report is anticipated to be posted by January 16, 2024, and can be found here.

Comments received by January 1, 2024, will be included in a staff analysis and forwarded to the Commission.

Comments received between January 2, 2024, and January 19, 2024, at Noon will be forwarded to the Commission.

LAST DAY FOR WRITTEN COMMENT:  January 19, 2024 at NOON

Please send comments to:

[email protected]

PROJECT INFORMATION:

Application for USE2023 0018

Application for PWP2023 0004

Questions?  Please contact:

Jennifer Shields, Planner II

[email protected]

(907) 586-0753, extension 4139

Conditional Use Permit for marijuana retail, cultivation and on-site consumption.

SCHEDULE:

Hearing before the Planning Commission on March 12, 2024.

The staff report is anticipated to be posted by March 5, 2024 and can be found here.

Comments received by February 19, 2024 will be included in a staff analysis and forwarded to the Commission.

Comments received between February 20, 2024 and March 8, 2024 at noon will be forwarded to the Commission.

LAST DAY FOR WRITTEN COMMENT:  MARCH 8, 2024, NOON

Please send comments to:

[email protected]

[email protected]

PROJECT INFORMATION:

Application

Questions?  Please contact:

Irene Gallion, Senior Planner

[email protected]

(907) 586-0753, extension 4130

Conditional Use Permit for a U-Haul Moving and Storage Facility utilizing an existing 122,278 square foot structure on a 10.75 acre lot in a General Commercial zoning district.

SCHEDULE:

Hearing before the Planning Commission on March 26, 2024.

The staff report is anticipated to be posted by March 18, 2024 and can be found here.

Comments received by March 4, 2024 will be included in a staff analysis and forwarded to the Commission.

Comments received between March 5, 2024 and March 22, 2024 at noon will be forwarded to the Commission.

LAST DAY FOR WRITTEN COMMENT:  MARCH 22, 2024, NOON

Please send comments to:

[email protected]

[email protected]

PROJECT INFORMATION:

site aerial photo

Application

Questions?  Please contact:

Ilsa Lund, Planner I

[email protected]

(907) 586-0753, extension 4128

Conditional Use Permit for Expansion of marijuana retail from approximately 430 square feet to 750 square feet.

SCHEDULE:

Hearing before the Planning Commission on March 12, 2024.

The staff report is anticipated to be posted by March 5, 2024 and can be found here.

Comments received by February 19, 2024 will be included in a staff analysis and forwarded to the Commission.

Comments received between February 20, 2024 and March 8, 2024 at noon will be forwarded to the Commission.

LAST DAY FOR WRITTEN COMMENT:  MARCH 8, 2024, NOON

Please send comments to:

[email protected]

[email protected]

PROJECT INFORMATION:

Application

Questions?  Please contact:

Irene Gallion, Senior Planner

[email protected]

(907) 586-0753, extension 4130

Expansion of existing food court.

SCHEDULE:

Hearing before the Planning Commission on April 9, 2024.

The staff report is anticipated to be posted by April 1, 2024 and can be found here.

Comments received by March 18, 2024 will be included in a staff analysis and forwarded to the Commission.

Comments received between March 19, 2024 and April 5, 2024 at noon will be forwarded to the Commission.

LAST DAY FOR WRITTEN COMMENT:  APRIL 5, 2024, NOON

Please send comments to:

[email protected]

[email protected]

PROJECT INFORMATION:

Application

Questions?  Please contact:

Irene Gallion, Senior Planner

[email protected]

(907) 586-0753, extension 4130

Applications request to build a 430 square foot accessory dwelling unit above an existing garage in a D18 zone. A request to waive the minimum parking requirements has also been made (see PWP2024 0001).

SCHEDULE:

Hearing before the Planning Commission on May 14, 2024.

The staff report is anticipated to be posted by May 6, 2024 and can be found here.

Comments received by April 22, 2024 will be included in a staff analysis and forwarded to the Commission.

Comments received between April 23, 2024 and May 10, 2024 at noon will be forwarded to the Commission.

LAST DAY FOR WRITTEN COMMENT:  May 10, 2024, NOON

Please send comments to:

[email protected]

[email protected]

PROJECT INFORMATION:

Application

Questions?  Please contact:

Ilsa Lund, Planner I

[email protected]

(907) 586-0753, extension 4128

USE2024 0006: Conditional Use Permit for three, two-story, apartment buildings with 16-unit SRO’s with private facilities in a D15 district

SCHEDULE:

Hearing before the Planning Commission on May 14, 2024.

The staff report is anticipated to be posted by May 6, 2024 and can be found here.

Comments received by April 22, 2024 will be included in a staff analysis and forwarded to the Commission.

Comments received between April 23, 2024 and May 10, 2024, at noon will be forwarded to the Commission.

LAST DAY FOR WRITTEN COMMENT:  May 10, 2024, NOON

Please send comments to:

[email protected]

[email protected]

PROJECT INFORMATION:

Application

Questions?  Please contact:

Joseph Meyers, Senior Planner

[email protected]

(907) 586-0753, extension 4209

USE2024 0007: Conditional Use Permit for Expansion of Community Center, from 7,625 to 9,984 square feet, at 3235 Hospital Drive in a General Commercial zone. Parking will be shared with neighboring buildings.

SCHEDULE:

Hearing before the Planning Commission on May 14, 2024.

The staff report is anticipated to be posted by May 6, 2024 and can be found here.

Comments received by April 22, 2024 will be included in a staff analysis and forwarded to the Commission.

Comments received between April 23, 2024 and May 10, 2024, at noon will be forwarded to the Commission.

LAST DAY FOR WRITTEN COMMENT:  May 10, 2024, NOON

Please send comments to:

[email protected]

[email protected]

PROJECT INFORMATION:

Application

Narrative

Pre-application notes

Plans

Parking Agreements

Lighting Description

Questions?  Please contact:

Irene Gallion, Senior Planner

[email protected]

(907) 586-0753, extension 4130

Conditional Use Permit to renovate ground floor patio and add a second-floor deck to existing commercial building for use by bar.

SCHEDULE:

Hearing before the Planning Commission on April 9, 2024.

The staff report is anticipated to be posted by April 2, 2024 and can be found here.

Comments received by March 18, 2024 will be included in a staff analysis and forwarded to the Commission.

Comments received between March 19, 2024 and April 5, 2024 at noon will be forwarded to the Commission.

LAST DAY FOR WRITTEN COMMENT:  APRIL 5, 2024, NOON

Please send comments to:

[email protected]

[email protected]

PROJECT INFORMATION:

Application

Questions?  Please contact:

Forrest Courtney, Planner I

[email protected]

(907) 586-0753, extension 4208

A Conditional Use Permit for a temporary asphalt plant at the Juneau International Airport

SCHEDULE:

Hearing before the Planning Commission on May 14, 2024.

The staff report is anticipated to be posted by May 6, 2024 and can be found here.

Comments received by April 22, 2024 will be included in a staff analysis and forwarded to the Commission.

Comments received between April 23, 2024 and May 10, 2024 at noon will be forwarded to the Commission.

LAST DAY FOR WRITTEN COMMENT:  May 10, 2024, NOON

Please send comments to:

[email protected]

[email protected]

PROJECT INFORMATION:

Application

Questions?  Please contact:

Teri Camery, Senior Planner, CFM

[email protected]

(907) 586-0753, extension 4129