Planning Commission

Archived Years

For older staff reports, please contact CDD directly.

Staff Reports Archive

Meeting DateCase NumberApplicantProject Description
08-27-2013AAP2013 0013Averyl Veliz

Conditional Use permit to build a 599 square foot accessory apartment within a new single family dwelling on a substandard lot in a D5 zoning district.

08-27-2013USE2013 0025David Heimbigner

Conditional Use to operate a 4 bedroom B&B in a D5 zoning district.

08-13-2013CSP2013 0017State of Alaska

Pavement resurfacing and gaurdrail rehabilitation on Egan Dr. from Tenth St (Juneau-Douglas Bridge) to Mendenhall Loop Rd.

08-13-2013APL2013 0003Eric Twelker

Initial Hearing to determine whether the Planning Commission will hear the Appeal of the director's determination to issue BLD2013 0302, a building permit to construct a detached garage with living space.

08-13-2013CSP2013 0020GCI

A City consistency permit to lease part of Eaglecrest Ski Area for a new cell tower.

08-13-2013CSP2013 0018State of Alaska

Resurface North Douglas Highway from the roundabout (Juneau-Douglas Bridge) to Fish Creek Road. Replace guardrail and signs. Complete minor drainage repairs at five locations.

08-13-2013APL2013 0004Bill Yankee

Initial hearing to determine whether the Planning Commission will hear the Appeal of the director's determination to allow fences within the 20' no disturbance greenbelt/visual buffer and 30' no-build structure setback in the Montana Creek subdivision

08-13-2013CSP2013 0016State of Alaska DOT & PF

Widen and rehabilitate separated shared use path along Mendenhall Loop Rd.

08-13-2013CSP2013 0019State of Alaska

Pave the entire length of Amalga Harbor Road, replace Peterson Creek Bridge and replace two Peterson Creek Tributary Bridges with large diameter pipe arches.

08-13-2013CSP2013 0017State of Alaska

Pavement resurfacing and guardrail rehabilitation on Egan Dr. from Tenth St (Juneau-Douglas Bridge) to Mendenhall Loop Rd.

Meeting DateCase NumberApplicantProject Description