Planning Commission

Archived Years

For older staff reports, please contact CDD directly.

Staff Reports Archive

Meeting DateCase NumberApplicantProject Description
07-09-2013USE2013 0020 & CSP2013 0014 Part 2CBJ Engineering

A Conditional Use permit and City Project review to expand existing snow storage by Mendenhall Glacier.

07-09-2013APL2013 0001Larry Dietrick

An appeal of a Director's Determination requiring an electrical easement for a proposed subdivision that would result in two lots.

07-09-2013USE2013 0021Miller Construction Co.

Permit to Modify USE2011 0017 to Extend Hours of Operation for Truck Hauling 7:00am - 5:30pm Monday - Friday; 9:00am - 5:30pm Saturday.

06-25-2013USE2013 0018Kristal Liska

Conditional Use to place coffee stand on industrial lot.

06-25-2013CSP2013 0013 Part 1CBJ Engineering Dept.

Construction of a seawalk between Miners Cove building and Franklin Dock restrooms.

06-25-2013CSP2013 0013 Part 2CBJ Engineering Dept

Construction of a seawalk between Miners Cove building and Franklin Dock restrooms.

06-25-2013USE2013 0022CBJ Engineering

Conditional use to allow emergency generator for Centennial Hall.

06-25-2013SMF2013 0002 & SMP2013 0001State of Alaska DOT & PF

A Preliminary and Final plat approval to adjust lot lines of Lots 1-10 Block C and Tract D-1 of Vintage II Subdivision for acquisition of Right of Way for the Brotherhood Bridge replacement project; Amend the site plan entitled 'Vintage Business Park' referred to in adopted ordinances.

06-25-2013AME2010 0009CBJ

Recommendation for Assembly to adopt new flood maps, study and regulations.

06-25-2013APL2013 0001Larry Dietrick

An appeal of a Director's Determination requiring an electrical easement for a proposed subdivision that would result in two lots.

Meeting DateCase NumberApplicantProject Description