Meadow Lane Improvements

BE22-188

Contractor: Coogan Construction Co.

Contract Amount: $2,088,347.00


Project Manager: John Nelson
Phone: 907-586-0800 extension 4189
Email: [email protected]
No Featured Image - Stock photo with plans and pencils and the words No Featured Image.

Description:

The WORK covered in the Contract Documents generally includes reconstruction of Meadow Lane between Stikine Street and the southern end. WORK includes replacement of the road base and asphalt with the addition of a valley gutter along both sides of the roadway. The WORK also includes replacement of the water, sewer and storm systems. WORK will consist of clearing and grubbing, excavation, ditch grading, replacement of the roadway section to a 24-inch depth with shot rock borrow, 2-inch minus shot rock with base course, and asphalt pavement, valley gutter, and other miscellaneous related WORK.