Calhoun Avenue Reconstruction, Phase 1

BE21-117

Contractor: North40 Construction Corp

Contract Amount: $1,885,217


Project Manager: John Nelson
Phone: 907-586-0800 Extension 4189
Email: [email protected]
No Featured Image - Stock photo with plans and pencils and the words No Featured Image.

Description:

The WORK covered in the Contract Documents includes reconstruction of Calhoun Avenue from the Gold Creek Bridge to the intersection of West 7th Street. WORK generally includes concrete slab removal, excavation, shot rock borrow, 2” minus shot rock with D-1 base course, asphalt pavement, curb and gutter, concrete sidewalk, ADA ramps, replacement of storm drain pipe, catch basins, manholes, sewer pipes, insulated HDPE water main and apparatuses, traffic control markings, signs and other miscellaneous WORK.