Channel Drive & Channel Vista Pump Station Rehabilitation
BE21-148
Completion Date: August 31, 2021
Contractor: Admiralty Construction, Inc.
Contract Amount: $741,600
Description:
Work includes the retrofit of two wastewater lift stations (pump stations) including demolition and replacement of wet well pumps, discharge piping and support brackets, pump rails, hardware, drain piping and valves, valve vault discharge piping and valves, force main connections, wet well and valve vault concrete lids and aluminum access hatches, on-grade concrete slabs surrounding pump stations, pump electrical gear, conduit and conductors, wet well level sensors and related equipment, demolition and replacement of the existing Channel Drive pump station control panel and installation of a pre-engineered fiberglass shelter on a slab-on-grade. Bypass pumping will be required to maintain wastewater service to the two associated sewer catchment areas, startup and testing of the two pump stations, and all ancillary work resulting in the functional performance of the pump stations.