Downtown Library Selective Cladding Replacement

BE20-235

Completion Date: 
October 14, 2020

Contractor: Carver Construction, LLC

Contract Amount: $128,117


Project Manager: Steve Tada
Phone: 907-586-0894
Email: [email protected]
No Featured Image - Stock photo with plans and pencils and the words No Featured Image.

Description:

Demolish exterior concrete board cladding assemblies including existing substrate, batt insulation, metal trim and flashing.  Install new exterior metal siding assembly including water barrier, metal flashings, fasteners, trim and accessories per the plans and specifications. Demo eight (8) existing exterior windows, flashings, hardware, gap insulation, sealants and salvage existing interior wood trim. Install eight (8) Owner furnished aluminum clad operable wood windows with vapor barrier, shims, all flashings including head flashings with drip edge, insulation, backer rods, sealants and accessories.   Replace water damaged interior wood trim with new where existing is not salvageable. Finish/refinish all interior facing wood to match existing adjacent finishes.