CBJ Stock Image

Paving work on Montana Creek Road scheduled for May

May 10, 2024 – News

Pavement repair work on Montana Creek Road between Back Loop Road and Arctic Circle is scheduled to take place before June 1. Work will include removal of pavement and placement of new asphalt pavement.

Because this work requires dry weather, it will be scheduled as weather allows and additional notice will be provided before work begins. Work will take place at night between 7 p.m. and 7 a.m. and is anticipated to take two nights.

Through traffic will be maintained during all work operations; however, please allow for traffic flaggers, pilot cars, and minor delays. Please stay alert to crews and equipment, follow all signs and guidance, and drive slowly and safety in the project area.

We appreciate your patience and cooperation and will make every effort to minimize inconvenience while this work is underway.

For questions or concerns, please contact:

John Hollatz, Wilson Engineering at (907) 321-7760 or [email protected]

Chase Saviers, SECON at (907) 209-6688 or [email protected]

John Nelson, CBJ Project Manager at (907) 957-2187 or [email protected]