2024 - Aurora Harbor Rebuild - Phase IV

Project Progress Bar with Five Steps: 1. Planning, 2. Design, 3. Permitting, 4. Construction, 5. Completed. Step 4 - Construction is selected.

Project Details

CBJ Contract #: DH25-022

Contractor: Western Marine Construction

Construction Cost: $7,589,700

Start Date: April 9, 2025

Completion Date: April 1, 2026

Contact: Matthew D. Sill, P.E.

Phone: (907) 586-0398
Email: [email protected]

General Site Plan

Project Overview

This Project consists of generally includes furnishing and installing 3910 SF of head walk floats, 5500 SF of main walk floats, 928 SF Tee float, 5 ea. 6x48 fingers, 12 ea. 6x42 fingers, and 8 ea. 4x4 finger floats. Additionally, the WORK includes furnishing and installing all required 12.75” diameter and 16” diameter steel pilings, refurbishing and installing an aluminum gangway, furnishing and installing a new 840 SF approach dock, furnishing and installing all-season potable water system and fire suppression system, furnishing and installing safety equipment, and furnishing and installing a GFCI protected electrical system and LED lighting system. The project also includes furnishing and installing pile anodes within the Aurora Harbor basin as an additive alternate.

Media