2024 - Aurora Harbor Drive Down Float

Project Progress Bar with Five Steps: 1. Planning, 2. Design, 3. Permitting, 4. Construction, 5. Completed. Step 1 - Planning is selected.

Project Details

Construction Cost: $14M (2024 estimate)

Contact: Matthew D. Sill, P.E.

Phone: (907) 586-0398
Email: [email protected]

Aerial photo of the project site with the concept shown as a drawing.

Project Overview

The project will build a drive down float and vehicle bridge, as well as incorporate two new 5-ton electric cranes, to serve the commercial fishing fleet and improve freight transportation. The facilities will improve safety, reduce overcrowding, and increase the efficiency of transporting goods between vessels and the road system.

In 2024, City and Borough of Juneau Docks & Harbors applied for and received a Port Infrastructure Development Grant from the Maritime Administration for $11,154,002.  The project funding additionally includes a $2,788,500 local match.  The PIDP grant documents may be found below.