2024 - Aurora Harbor Drive Down Float

Project Details
Construction Cost: $14M (2024 estimate)Contact: Matthew D. Sill, P.E.
Phone: (907) 586-0398Email: [email protected]
Project Overview
The project will build a drive down float and vehicle bridge, as well as incorporate two new 5-ton electric cranes, to serve the commercial fishing fleet and improve freight transportation. The facilities will improve safety, reduce overcrowding, and increase the efficiency of transporting goods between vessels and the road system.
In 2024, City and Borough of Juneau Docks & Harbors applied for and received a Port Infrastructure Development Grant from the Maritime Administration for $11,154,002. The project funding additionally includes a $2,788,500 local match. The PIDP grant documents may be found below.
Associated Documents
Additional Documents
- Attachment-J_Letters-of-Support-2024.pdf
- Attachment-H_Project-Cost-Estimate-5.9.24.pdf
- Attachment-G_Juneau-Comprehensive-Plan-Update-2013.pdf
- Attachment-F_Project-Planning-Document_Juneau-Downtown-Harbors-Uplands-Master-Plan-2017.pdf
- Attachment-E_Engineering-Drawings-5.9.24.pdf
- Attachment-D_Funding-Commitment-Letter-5.9.24.pdf
- Attachment-C_Project-Schedule-5.9.24.pdf
- Attachment-A_BCA-Aurora-Harbor-Drive-Down-Float-5.9.24.pdf
- 2024-PIDP_Aurora-Harbor-Drive-Down-Float-Project.pdf
- Welcome-Aboard-letter-PIDP-2024-Final.pdf