Description:
The purpose of the project is to install a non-public water well with an 8” diameter well casing that meets an output of 1.5 to 2.5 gallons per minute at the CBJ Eagle Valley Center, located approximately 25 miles North of Juneau. A well pump, vertical piping and pitless adaptor will be installed by the Contractor via Change Order to the Contract.
|