EPW – Bid/RFP Registered View April 8th, 2020| Bid/RFP Listings E10-275Design, Production and Installation of Art for Zach Gordon Youth Center Outdoor Play Area 5/28/2010$5,000 E10-274Eaglecrest Beginner Chairlift Electrical 6/16/2010$85,000 E10-273CBJ Consolidated Public Works Facility Streets Wing Addition 7/1/2010$2,000,000.00 E10-269Stabler Point Quarry Overburden Stripping 2010 5/6/2010$23,000 E10-265Eaglecrest Drinking Water System Improvements 4/29/2010$15,000.00 E10-261Gold Creek Flume Power Washing 4/29/2010$25,000.00 E10-259Montana Creek Road Bus Shelter Installation 4/23/2010$31,000 E10-256CCTHITA / CBJ 2010 AREA WIDE PAVING 6/16/2010$500,000 E10-255Snow Management Assessment and Planning 5/7/2010N/A E10-245Mendenhall Valley Wastewater Treatment Plant (MVWWTP) Ongoing Fuel Leak Clean-up Assistance 5/21/2010 E10-241Design Services for the Downtown Parking Facility - Cathodic Protection Repairs 5/19/2010 E10-237Glacier Valley Elementary School Rubber Fall Protection Surfacing 4/13/2010$61,000.00 E10-235Supply Concrete for Eaglecrest Porcupine Chairlift 0000-00-00$20,000 E10-231Auke Bay Elementary School Planning 4/15/2010 E10-229South Franklin Street Water Imrpovements - This is an RFQ, under $50K project 3/23/2010$37,500.00 E10-228Floyd Dryden Parking Improvements adjusting existing manholes to finished grade and painted traffic markings."$170,814 E10-225Inspection Services for 2010 Area Wide Paviing 4/27/2010$70,000.00 E10-221Bartlett Regional Hospital (BRH) Medical / Surgical East Wing Renovation 8/10/2010Approximately $3.9 Million E10-219Capital City Fire and Rescue (CCFR) Sectional Doors and Operators Replacement 5/4/2010$290,000.00 E10-217CBJ Water Reservoir - 2010 Corrosion Repairs & Valve Vault Painting 7/28/2010$250,000 E10-213Design, Production, and Installation of Art for Harborview Elementary School 4/15/2010 E10-210Supply Eaglecrest Shot Rock 3/18/2010 E10-209Glacier Valley Elementary School Playground Upgrades 4/8/2010$460,000 E10-207Contract Administration and Inspection Services for Casey Shattuck Reconstruction, Phase V and Lower Highland Drive Reconstruction 4/14/2010 E10-203Marie Drake School Boiler Room Upgrades 3/18/2010$607,000.00