BRH Administration Building Exterior Envelope Rehab

Proposal Due Date: 2023-02-28 white pixel, space holder

2023-02-16

Type of Solicitation: 
Bid
Bid/RFP Number: 
BE23-199
Date Advertised: 2023-02-07
Construction Estimate: $300,000-$400,000
Plan Holders List: Current List
Cost of Bid Documents: N/A

Description:

This Project consists of removal the existing siding and underlying vapor barrier; remove the window assemblies and plywood sheathing.  Retain existing siding and windows for reinstallation as specified. Inspect the existing rigid and fiberglass insulation for suitability and where unsuitable replace as directed.   Install new plywood sheathing, and windows.  Construct a “rain-screen´ assembly as designed.  Re-install salvaged siding and flashing as detailed.

Result

Low Bidder: Carver Construction, LLC

Bid Opening/Proposal Date: 2023-02-28
Bid Amount: $598,347.83
Bid/RFP Result Summary: View Document
Award Date 
Award Amount: 
Notice of Award: View Document
Bid/RFP Documents: https://juneau.org/index.php?gf-download=2023%2F03%2FBE23-199_BRH-Admin-Bldg.pdf&form-id=96&field-id=72&hash=549ad1402a91f4502cdd74f36e6ce6f9c791d241a2e3fd657b2b98208a19295d
Addenda and Additional Information: