Downtown Street Improvements Phase IIIA

Bid Due Date: white pixel, space holder 1/8/2019

Pre-Bid Meeting:

Type of Solicitation: 
Bid
Bid/RFP Number: 
BE19-112
Date Advertised: 12/12/2018
Construction Estimate: $509,000
Plan Holders List: Current List
Cost of Bid Documents: $35

Description:

Reconstruction of Ferry Way from Franklin Street to Marine Way, and a new crosswalk on Marine Way at Seward Street. The Ferry Way storm drain and sanitary sewer systems will be reconstructed, the road embankment will be replaced to a 24-inch depth and surfacing materials will be replaced with new asphalt pavement, concrete curb and gutter, and concrete sidewalk. Planters, benches and trees will be installed within the bulbouts at the intersection of Ferry Way and Marine Way. Only minor improvements will be made to the water system. The existing street-lighting system will be replaced with new pole-mounted, light emitting diode (LED) lights.

Result

Low Bidder: Arete Construction Corporation

Bid Opening/Proposal Date: 1/8/2019
Bid Amount: $550,763
Bid/RFP Result Summary: View Document
Award Date: 1/31/2019
Award Amount: $550,763
Notice of Award:  View Document