List of Documents

1995-04-04
Supplementary Information: Relating to the February 2, 1995 Comments on the Corps of Engineers Public Notice No. 2-900592, Lynn Canal 31, and the EPA Technical Assistance Report
Specifically Rleating to: Finding #1 - Additional Wastewater Treatment; Finding #4 - Outfall Location; Finding #5 - Lack of Potential for Long-Term Contamination --- Specific Reports Included Are: Water Treatability; An Investigation of the Recovery of Gold from Kensington Project Samples Submitted by Echo Bay Mines (Progress Report No. 1); Doppler Current Measurement and Marine Outfall Site Determination; Risk Estimate for Consumption of Seafood Collected Near the Proposed Kensington Mine Outfall
1992-02-01
Kensington Gold Project: Final Environmental Impact Statement, Volume 1
1992-02-01
Kensington Gold Project: Final Environmental Impact Statement, Volume 2
1992-11-01
Juneau State Land Plan: Mineral Location Closures
1997-09-01
Kensington Gold Project; Large Mine Permit Review, CBJ
1994-12-21
Kensington Venture: Tailings Storage Facility, Site Inspection Manual (Ref. No. 3286/3)
Kensington Venture Technical Assistance Report Comments Attachment 4-A
1994-12-21
Kensington Venture: Tailings Storage Facility, Operation and Maintenance Manual (Ref. No. 3286/4)
Kensington Venture Technical Assistance Report Comments Attachment 4-B
1994-12-21
Kensington Venture: Drawings (Ref. No. 3286/8)
Kensington Venture Technical Assistance Report Comments Attachment 4-E
1994-12-21
Kensington Venture: Contract No. 21196-CC-003, Exhibit \"D\" Part I: Technical Specifications (Ref. No. 3286/7)
Kensington Venture Technical Assistance Report Comments Attachment 4-D
1998-04-14
RE: Kensington Gold Project, Lynn Canal 31, State I.D. No. AK9702-17PA: Final Consistency Determination
memorandum
1997-02-27
Re: 1997 Kensington Mine Proposal, State I.D. No. AK9702-17PA
1997-02-27
Re: 1997 Kensington Mine Proposal, State I.D. No. AK9702-17PA
1997-09-02
RE: Alaska-Juneau (A-J) Gold Mine Discharges: State I.D. No. AK 9504-01PA
1997-04-04
RE: Kensington Gold Project Draft Supplemental Impact Statement, AK 9702-18PA
1997-06-03
RE: 1997 Kensington Mine Proposal, State I.D. No. AK9702-17PA: Additional Information, Camp Ck. Site-Specific Criteria
1996-07-01
Review of Dry Tailings Disposal
1996-06-28
Summary of Kensington Project; Description of Changes
1997-07-16
Camp Creek Application Data Package for TDS Site Specific Criteria
1997-05-01
Final Socioeconomic Impact Assessment: Kensington Gold Project
1994-07-19
Kensington Venture: Final Report on Hydrology (Ref. No. 3286/6)
Kensington Venture Technical Assistance Report Comments Attachment 4-C
1994-12-21
Kensington Venture: Supplementary Report No. 2 on Embankment Design (Ref. No. 3286/9)
Kensington Venture Technical Assistance Report Comments Attachment 4-F
1994-09-21
Kensington Gold Project 30-Year Event Sedimentation
Kensington Venture Technical Assistance Report Comments Attachment 5-A
1994-12-01
Geochemical Characterization of the Kensington Gold Deposit
Kensington Venture Technical Assistance Report Comments Attachment 3-B
1994-11-01
Analysis of Acid-Base Accounting Data: Kensington Mine Project
Kensington Venture Technical Assistance Report Comments Attachment 3-A
1994-12-01
Snow Avalanche Hazard Analysis and Mitigation Recommendations for the Kensington Mine
Kensington Venture Technical Assistance Report Comments Attachment 1