CBJ Stock Image

Auke Lake parking lot and ramp closed Sept. 13-15 for shelter construction

September 4, 2019 – FYI

The Auke Lake Wayside Parking Lot and launch ramp will be closed Friday, September 13 through Sunday, September 15 to allow for the construction of the Auke Lake Wayside Shelter. The Auke Lake Trail will remain open during the shelter build.

 The shelter, which is made of Sitka spruce from Icy Straits Lumber, is part of the 2012 Auke Lake Wayside Master Plan. Picnic tables will be installed by the end of September.

 Funding for the shelter is from all four Rotary groups in Juneau and the Juneau Park Foundation. The Rotary groups are also providing labor for the shelter build. The City and Borough of Juneau paid for the cement pad.

For more information, contact Parks and Recreation at 586-5226.