Topsoil - Includes change listed in 5/5/04 Errata Sheet No. 3 | | Engineering & Public Works |
Seeding | | Engineering & Public Works |
Landscape Planting | | Engineering & Public Works |
Jute Mesh | | Engineering & Public Works |
Filter Cloth | | Engineering & Public Works |
Underdrain | | Engineering & Public Works |
Remove and Dispose of Culvert Pipe | | Engineering & Public Works |
Storm and Sanitary Structure Removal | | Engineering & Public Works |
Sign Assembly | | Engineering & Public Works |
Mailboxes | | Engineering & Public Works |
Painted Traffic Markings | | Engineering & Public Works |
Asphalt Concrete Pavement - Includes changes listed in Errata 1 through 4 | | Engineering & Public Works |
Tack Coat | | Engineering & Public Works |
Fog Seal Coat | | Engineering & Public Works |
Remove Existing Asphalt Surfacing | | Engineering & Public Works |
Structural Concrete | | Engineering & Public Works |
Concrete Structures | | Engineering & Public Works |
Sidewalk, Curb and Gutter | | Engineering & Public Works |
Remove Existing Sidewalk, Concrete Slab, or Curb and Gutter | | Engineering & Public Works |
FY 2020-2025 - Final | | Engineering & Public Works |
FY 2019-2024 - Final | | Engineering & Public Works |
FY 2018-2023 - Final | | Engineering & Public Works |
FY 2017-2022 - Final | | Engineering & Public Works |
FY 2016-2021 - Final | | Engineering & Public Works |
FY 2015-2020 - Final | | Engineering & Public Works |