Document Archive
Title: | AJ Mine Related Water Study, February 24, 2012 - DRAFT |
---|---|
Date Prepared: | February 24, 2012 |
Prepared By: | Rorie Watt, CBJ Engineering Director; Carson Dorn, Inc.; Juneau Watershed Partnership; Tetra Tech |
Prepared For: | CBJ Assembly |
Version: | Draft |
Department: | Engineering |
Physical Location of the Document: | Clerk 224 |
Comments/Summary: | Distributed to the Assembly Feb 27, 2012 - Public meeting scheduled for March 7, 2012 - report will be finalized following public comment. |