Harbors – Project Archive Database November 20th, 2020| 2013 - Aurora Harbor Re-Build - Phase I 2017 - Downtown Harbors Uplands Master Plan - Bridge Park to Norway Point 2018 - Marine Park to Taku Dock Urban Design Plan 2019 - Cruise Ship Security Checkpoints 2020 - Aurora and Harris Harbor Dredging 2020 - Douglas Harbor Anode Installation 2020 - Downtown Waterfront Improvements - Phase I 2020 - Statter Harbor Improvements Ph III(A) 2021 - Harris Harbor Anode Installation 2021 - Small Cruise Ship Infrastructure Master Plan 2021 - Statter Harbor D Float Damage 2021 - Statter Harbor Improvements Ph III(B) 2021 - Taku Seawalk Releveling Project 2022 - Juneau Cruise Ship Dock Electrification Study 2022 - Marine Park Deckover 2022 - Statter Harbor Phase IIIC - Restrooms and Covered Shelter 2022 - Waterfront Safety Improvements 2023 - Aurora Harbor Rebuild - Phase III 2023 - Aurora Harbor Rebuild, Phase III 2024 - Aurora Harbor Drive Down Float 2024 - Aurora Harbor Rebuild - Phase IV 2024 - Statter Harbor Wave Attenuator Replacement 2025 - Statter Harbor Improvements Phase III(D) Upland Improvements 2025 - Statter Harbor Re-Roof 2025 - Taku Harbor Improvements