Outer Drive & West Juneau Wastewater Lift Station Improvements

Proposal Due Date: 2023-02-23 white pixel, space holder

2023-02-02

Type of Solicitation: 
Bid
Bid/RFP Number: 
BE23-194
Date Advertised: 2023-01-25
Construction Estimate: $3.5M to $4.0M
Plan Holders List: Current List
Cost of Bid Documents: N/A

Description:

The WORK covered in the Contract Documents includes retrofit of two wastewater lift stations (pump stations) including bypass pumping, cure-in-place pipe lining of 30-inch gravity sewer main, structural concrete modifications, miscellaneous metals fabrication for wastewater facilities, removal and replacement of; ductile iron process piping, sewer slide gates, access hatches and safety grating, metal ladders, miscellaneous process and drain piping, wastewater process valves, dry-pit submersible wastewater pumps, instrumentation, pump power supply and controls, potable water plumbing, HVAC ducting, unit heater and blower system, pump electrical gear, conduit and conductors, water level sensing devices and related equipment. Bypass pumping will be required to maintain wastewater service to the two associated sewer catchment areas, and one or more sewer service lines. Startup, commissioning, and performance optimizing of the two pump stations, and all ancillary work resulting in the functional performance of the pump stations is included.

Result

Low Bidder: Admiralty Construction, Inc

Bid Opening/Proposal Date: 2023-02-23
Bid Amount: $5,982,500.00
Bid/RFP Result Summary: View Document
Award Date 
Award Amount: 
Notice of Award: View Document
Bid/RFP Documents: https://juneau.org/index.php?gf-download=2023%2F03%2FBE23-194_Volume-1.pdf&form-id=96&field-id=72&entry-id=92147&hash=f234fe35a44e28d4710fe7bb018177f96a9c199db5043af5d9382ce49371f110
https://juneau.org/index.php?gf-download=2023%2F03%2FBE23-194_Volume-2.pdf&form-id=96&field-id=72&entry-id=92147&hash=43f91b1ca31fb9829b33b2806f9ae3f5305a0b2d03469b9ea369154a12f445fc
Addenda and Additional Information: