2023 - Aurora Harbor Rebuild, Phase III
Project Overview
The Work includes the fabrication and installation of 4500 square feet of mooring floats, four (4) 12.75" diameter steel piles, twenty-one (21) 16" diameter steel piles, six (6) 6'x48' finger floats, three (3) 8' x 60' finger floats and 1180 square feet Tee float. Additional work includes refurbishing the existing gangway landing float and the existing gangway, furnishing and installing potable water system and fire suppression system, furnishing and installing electrical components.
ENGINEER'S ESTIMATE RANGE: Between $3.5M - $4M