The Planning Commission Meeting will occur January 26, 2021, at 7 P.M. This meeting will be virtual and telephonic only, and will be to review applications for an accessory apartment and associated parking waiver, and street maintenance of Crest Street. These items are up for public hearing.

This virtual meeting will be by video and telephonic participation only. To join the webinar, paste this URL into your browser: https://juneau.zoom.us/j/98351893348. To participate telephonically, call: 1-346-248-7799 or 1-669-900-6833 or 1-253-215-8782 or 1-312-626-6799 or 1-929-436-2866 or 1-301-715-8592 and enter Webinar ID: 983 5189 3348. At the start of testimony, the caller will be asked to state their name, place of residence, and will be asked to stay on the phone after their testimony to answer any questions from the Commission. If you have any questions about the procedure, please contact the Community Development Department at 907-586-0715.

The public is encouraged to submit written comments to [email protected] by 12 noon, January 25, or testify telephonically at the meeting. For more information related to the Planning Commission Meeting agenda items, click here.

 

Conditional Use Permit for an accessory apartment on an undersized lot and associated parking waiver of one space (USE2020 0025 & PWP2020 0004)

The applicant requests a Conditional Use Permit for an accessory apartment on an undersized lot in a D5 zoning district, as well as a parking waiver for one parking space. The proposed accessory apartment measures less than 600 square feet, and will be located within an existing single-family dwelling. The lot is located on a corner where East Street turns into Basin Road and on-street parking directly in front of the lot is not allowed.

Complete street and underground utility maintenance, and addition of a sidewalk on one side on Crest Street (CSP2020 0012)

This road reconstruction and replacement project includes, reconstruction and repaving of two 12-foot lanes; curb, gutter, and sidewalk on the west side of the road, with underground drainage; sidewalk ADA tactile landings and street lighting at intersections; moving existing underground drainage at the south end of the project off of private property and into the right-of-way, adding an oil/water separator; replacement of the water main; replacement of the large sewer line; and drainage quality improvements.