The Planning Commission meets March 9, 2021, at 7 P.M. This meeting will be virtual and telephonic only, and will be to review the modification of a Conditional Use Permit to change access requirements from one ingress/egress to two, and complete street and underground utility maintenance on Calhoun Avenue. These items are up for public hearing.

This virtual meeting will be by video and telephonic participation only. Join the virtual meeting online https://juneau.zoom.us/j/91522199344 or call: 1-346-248-7799 or 1-669-900-6833 or 1-253-215-8782 or 1-312-626-6799 or 1-929-436-2866 or 1-301-715-8592 and enter Webinar ID: 915 2219 9344. If you’re giving public comment, you’ll be asked to state your name, place of residence, and will be asked to stay on the phone after your testimony to answer any questions from the Commission. For more information about the procedure, contact the Community Development Department at 907-586-0715.

The public is encouraged to submit written comments to [email protected] by 12 noon, March 8, or testify at the meeting. Read the Planning Commission Meeting agenda here.

 

Modification of Conditional Use Permit USE2020 0027 access requirements from one ingress/egress to two: Ingress off of Main Street and Egress onto Front Street (USE2021 0001)

The applicant requests a modification to previously- approved access to surface parking from one ingress/egress on Front Street to two. The proposed ingress would be through a driveway off Main Street, and the proposed egress through a driveway onto Front Street. Approval of the modification would allow for greater maneuverability within the parking lot and easier access.

 

Complete street and underground utility maintenance (and replacements as necessary) on Calhoun Avenue (CSP2020 0011)

This project will rehabilitate the road prism and drainage, replace the water and sewer systems that have exceeded expected service life, replace sidewalks, and repave the roadway. Surface improvements include widening the sidewalk as much as possible. Phase 1 is from the Governor’s Mansion to Cope Park. Phase 2 is from the Governor’s Mansion to Main Street, and only requires minor utility improvements.