Document Archive
| Title: | AJ Mine Related Water Study, February 24, 2012 - DRAFT |
|---|---|
| Date Prepared: | February 24, 2012 |
| Prepared By: | Rorie Watt, CBJ Engineering Director; Carson Dorn, Inc.; Juneau Watershed Partnership; Tetra Tech |
| Prepared For: | CBJ Assembly |
| Version: | Draft |
| Department: | Engineering |
| Physical Location of the Document: | Clerk 224 |
| Comments/Summary: | Distributed to the Assembly Feb 27, 2012 - Public meeting scheduled for March 7, 2012 - report will be finalized following public comment. |
