CBJ Water Reservoir - 2010 Corrosion Repairs & Valve Vault Painting

Proposal Due Date: white pixel, space holder 7/28/2010

Pre-Bid Meeting:

Type of Solicitation: 
Bid
Bid/RFP Number: 
E10-217
Date Advertised: 6/11/2010
Construction Estimate: $250,000
Plan Holders List: Current List
Cost of Bid Documents: $30.00

Description:

The WORK covered under the Base Bid of the Contract Documents generally consists of cleaning and repairing damaged finishes on the exterior surfaces of Lemon Creek Reservoir, a 1.6 million-gallon welded steel potable water reservoir and the ductile iron piping in the associated valve vault. The WORK covered under Additive Alternate 1 of the Contract Documents generally consists of cleaning and repairing damaged finishes on the exterior surfaces of Auke Lake Reservoir, a 1.43 million-gallon welded steel potable water reservoir.