REDUCED BID PERIOD: Marie Drake School Fan Replacement and HVAC Control Upgrades Re-Bid

Bid Due Date: blank 4/23/2019

Pre-Bid Meeting:

Type of Solicitation: Bid
Bid/RFP Number: MR BE19-243
Date Advertised: 
Construction Estimate: $890,000
Plan Holders List: Current List
Cost of Bid Documents: $35
Project Description:

THIS PROJECT HAS A REDUCED BID PERIOD. Marie Drake Fan Replacement and HVAC Controls Upgrade - REBID: Work to be completed over 2 summer breaks. Work includes removing existing pneumatics and DDC controls and replace with new integrated DDC controls. Mechanical work includes replacement and/or the consolidation of several Air Handling Units along with upgrades to the hydronic system throughout. Provide Electrical power and Communications work related to Mechanical work. Provide abatement of hazardous materials, cutting, patching, priming & painting (per revised specification 017300) of walls or ceilings where controls, thermostats and HVAC related components have been demolished or installed.

Result

Low Bidder: Schmolck Mechanical Contractors

Bid Opening/Proposal Date: 4/23/2019
Bid Amount: $899,023
Bid/RFP Result Summary: View Document
Award Date: 5/10/2019
Award Amount: $899,023
Notice of Award:  View Document