CDD Logo

REDUCED BID PERIOD: Marie Drake School Fan Replacement and HVAC Control Upgrades Re-Bid

Proposal Due Date: white pixel, space holder 4/23/2019

Pre-Bid Meeting:

Type of Solicitation: 
Bid
Bid/RFP Number: 
MR BE19-243
Date Advertised: 4/12/2019
Construction Estimate: $890,000
Plan Holders List: Current List
Cost of Bid Documents: $35

Description:

THIS PROJECT HAS A REDUCED BID PERIOD. Marie Drake Fan Replacement and HVAC Controls Upgrade - REBID: Work to be completed over 2 summer breaks. Work includes removing existing pneumatics and DDC controls and replace with new integrated DDC controls. Mechanical work includes replacement and/or the consolidation of several Air Handling Units along with upgrades to the hydronic system throughout. Provide Electrical power and Communications work related to Mechanical work. Provide abatement of hazardous materials, cutting, patching, priming & painting (per revised specification 017300) of walls or ceilings where controls, thermostats and HVAC related components have been demolished or installed.

Bid/RFP Documents:
  • Download Instructions
  • Addenda and Additional Information:
  • Pre-Bid Attendance
  • Addendum 1