Lemon Creek Fire Hydrant
Proposal Due Date:
tapped off of the 12" water pipe. The final slope shall be armored with 6""-12"" shot rock slope protection. The project will include removing and replacing approximately twenty square-feet of asphalt sidewalk"
Type of Solicitation:
RFQ
Bid/RFP Number: E12-072
Date Advertised: 8/3/2011
Construction Estimate: $15,600
Plan Holders List: Current List
Cost of Bid Documents: -----
Description:
Contractor shall provide all labor, equipment, materials and perform all work for removal of approximately 18' of 12 water pipe and the installation of a new fire hydrant and pad. The remaining twelve inch water pipe will be capped and include the installation of a thrust block. The project will include excavation of existing valve to verify the operational condition and include the replacement of the existing valve box. The fire hydrant will be installed using a tapping saddle
Bid/RFP Documents:
RFQ E12-072
Addenda and Additional Information:
https://juneau.org/wp-content/uploads/2019/10/20110816081143-0.pdf
CBJ ROW Permit
DOT Permit
Addendum 1