CDD Logo

Gold Creek Flume Concrete Patching

Proposal Due Date: white pixel, space holder 3/8/2011

Pre-Bid Meeting:

Type of Solicitation: 
Bid
Bid/RFP Number: 
E11-205
Date Advertised: 2/15/2011
Construction Estimate: $135,000
Plan Holders List: Current List
Cost of Bid Documents: $20

Description:

This project consists of all work necessary to patch the eroded concrete channel floor of the upper reaches of the Gold Creek Flume and replacement of eroded concrete from between iron protection rails with cement-based metallic-aggregate topping material as shown in the drawings, and other miscellaneous work.