South Franklin Street Water Imrpovements - This is an RFQ, under $50K project
Proposal Due Date:
3/23/2010
Type of Solicitation:
RFQ
Bid/RFP Number: E10-229
Date Advertised: 0000-00-00
Construction Estimate: $37,500.00
Plan Holders List: Current List
Cost of Bid Documents: -----
Description:
o Remove five existing valves and replace with three new 12” diameter water valves, fittings and piping in South Franklin Street as shown. Remove and replace asphalt concrete paving and D-1 sub-base in South Franklin Street as shown.
o Remove and replace two 12” flanged water valves in the Mill Tunnel Pressure Reducing Building.
o Connect to the existing 4” PVC drain line from the Mill Tunnel Pressure Reducing Building and extend it approximately 60’ to a drainage swale located south of the building.
Bid/RFP Documents:
Quote Summary - E10-229
Addenda and Additional Information:
RFQ E10-229 - Drawings
Addemdum No. 1 Text - RFQ E10-229
Addendum No. 1 AK DOT&PF Permit - RFQ E10-229
Addendum No. 1 C-2 and C-3 Drawings