Calhoun Avenue Reconstruction, Phase 1
Proposal Due Date: 2021-12-14
Pre-Bid Meeting Date: 2021-11-30
Type of Solicitation: Bid
Bid/RFP Number: BE21-117
Description:
The WORK covered in the Contract Documents includes reconstruction of Calhoun Avenue from the Gold Creek Bridge to the intersection of West 7th Street. WORK generally includes concrete slab removal, excavation, shot rock borrow, 2” minus shot rock with D-1 base course, asphalt pavement, curb and gutter, concrete sidewalk, ADA ramps, replacement of storm drain pipe, catch basins, manholes, sewer pipes, insulated HDPE water main and apparatuses, traffic control markings, signs and other miscellaneous WORK
Result
Low Bidder: North40 Construction Corp.
Bid Opening/Proposal Date: 2021-12-14
Bid Amount: $1,885,217.00