Downtown Library Exterior Window Replacement

BE19-227

Completion Date: 
October 31, 2019

Contractor: Carver Construction, LLC

Contract Amount: $148,720


Project Manager: Steve Tada
Phone: 907-586-0894
Email: [email protected]
No Featured Image - Stock photo with plans and pencils and the words No Featured Image.

Description:

Selective demolition and replacement of insulated glazing units (IGU’s) within the existing metal storefront assemblies including all plant, labor, accessories, and manually operated window shades per the drawings and specifications. Remove and dispose of twelve (12) existing aluminum clad wood casement windows including exterior metal flashings, hardware, shims and accessories. Repair any damage to the existing weather-proof menbranes and interior wood trim after demolition as required. Install twelve (12) new aluminum clad wood windows, exterior metal flashings, hardware, shims and accessories. All windows to match existing operation and be installed weathertight per the plans and specifications.