Outer Drive & West Juneau Wastewater Lift Station Improvements
Proposal Due Date:
2023-02-23
Pre-Bid Meeting: 2023-02-02
Description:
The WORK covered in the Contract Documents includes retrofit of two wastewater lift stations (pump stations) including bypass pumping, cure-in-place pipe lining of 30-inch gravity sewer main, structural concrete modifications, miscellaneous metals fabrication for wastewater facilities, removal and replacement of; ductile iron process piping, sewer slide gates, access hatches and safety grating, metal ladders, miscellaneous process and drain piping, wastewater process valves, dry-pit submersible wastewater pumps, instrumentation, pump power supply and controls, potable water plumbing, HVAC ducting, unit heater and blower system, pump electrical gear, conduit and conductors, water level sensing devices and related equipment. Bypass pumping will be required to maintain wastewater service to the two associated sewer catchment areas, and one or more sewer service lines. Startup, commissioning, and performance optimizing of the two pump stations, and all ancillary work resulting in the functional performance of the pump stations is included.