CDD Logo

West Third & Dixon Street Reconstruction

Proposal Due Date: 2022-03-31 white pixel, space holder

Pre-Bid Meeting: 2022-03-17

Type of Solicitation: 
Bid
Bid/RFP Number: 
BE22-232
Date Advertised: 2022-03-10
Construction Estimate: Between $450,000and $500,000
Plan Holders List: Current List
Cost of Bid Documents: -----

Description:

The WORK covered in the Contract Documents generally includes reconstruction of West Third Street and Dixon Street between Main Street and the end of the legislative parking lot. WORK includes replacement of the road base and asphalt, sidewalks, curb and gutter, and handrailing.  The WORK includes replacement of the water, some sewer work, and addition of some storm pipes and structures. WORK will include an ADA and IBC accessible wood ramp. WORK will consist of hand clearing, excavation, replacement of the roadway section with 2-inch minus shot rock with base course, and asphalt pavement, and other miscellaneous related WORK.

Bid/RFP Documents:
BE22-232.pdf
Addenda and Additional Information: