BRH Administration Building Exterior Envelope Rehab

Bid Due Date: 2023-02-28 white pixel, space holder

Pre-Bid Meeting: 2023-02-16

Type of Solicitation: Bid
Bid/RFP Number: BE23-199
Date Advertised: 2023-02-07
Construction Estimate: $300,000-$400,000
Plan Holders List: Current List
Cost of Bid Documents: N/A
Project Description:

This Project consists of removal the existing siding and underlying vapor barrier; remove the window assemblies and plywood sheathing.  Retain existing siding and windows for reinstallation as specified. Inspect the existing rigid and fiberglass insulation for suitability and where unsuitable replace as directed.   Install new plywood sheathing, and windows.  Construct a “rain-screen´ assembly as designed.  Re-install salvaged siding and flashing as detailed.

Result

Low Bidder: Carver Construction, LLC

Bid Opening/Proposal Date: 2023-02-28
Bid Amount: $598,347.83
Bid/RFP Result Summary: View Document
Award Date: 
Award Amount: 
Notice of Award: 