West Third & Dixon Street Reconstruction
Bid Due Date:
2022-03-31
Pre-Bid Meeting: 2022-03-17
Type of Solicitation: Bid
Bid/RFP Number: BE22-232
Date Advertised: 2022-03-10
Construction Estimate: Between $450,000and $500,000
Plan Holders List: Current List
Cost of Bid Documents: -----
The WORK covered in the Contract Documents generally includes reconstruction of West Third Street and Dixon Street between Main Street and the end of the legislative parking lot. WORK includes replacement of the road base and asphalt, sidewalks, curb and gutter, and handrailing. The WORK includes replacement of the water, some sewer work, and addition of some storm pipes and structures. WORK will include an ADA and IBC accessible wood ramp. WORK will consist of hand clearing, excavation, replacement of the roadway section with 2-inch minus shot rock with base course, and asphalt pavement, and other miscellaneous related WORK.
Result
Low Bidder: Admiralty Construction, Inc
Bid Opening/Proposal Date: 2022-03-31
Bid Amount: $612,185.00
Bid/RFP Result Summary: View Document
Bid/RFP Documents:
Addenda and Additional Information: