Juneau Douglas Treatment Plant Electrical Upgrades

Bid Due Date: 2021-06-17 white pixel, space holder

Pre-Bid Meeting: 2021-06-04

Type of Solicitation: Bid
Bid/RFP Number: BE21-141
Date Advertised: 2021-05-27
Construction Estimate: $400,000
Plan Holders List: Current List
Cost of Bid Documents: Download Only
Project Description:

The Juneau Douglas Wastewater Treatment Plant motor control center (MCC) has exceeded its useful life and is to be upgraded under this contract. The upgrade work includes but is not limited to: demolition of existing MCC room internal walls, flooring, ceiling and windows, with hazardous (HAZMAT) material abatement required during wall demolition; installation of temporary power generator and feeds to maintain plant operations during construction; demolition of obsolete electrical equipment, conduits and conductors; construction of new internal walls, interior finishing, exterior windows, and concrete housekeeping pad; installation of heating and cooling equipment, and lighting; installation of new electrical equipment including CT enclosure, main breaker, ATS, distribution panels, MCCs including VFDs; and, installation of all equipment required for a complete and operable control system  - network panel/cabinet, PLC control panel, telephone punch down cabinet, etc.

Result

Low Bidder: Chatham Electric

Bid Opening/Proposal Date: 2021-06-17
Bid Amount: $559,000
Bid/RFP Result Summary: View Document
Award Date: 2021-07-23
Award Amount: $559,000