CDD Logo

Mendenhall River Community School Site and Playground Upgrades

Bid Due Date: 2021-05-25 white pixel, space holder

Pre-Bid Meeting: 2021-05-07

Type of Solicitation: Bid
Bid/RFP Number: BE21-240
Date Advertised: 2021-04-30
Construction Estimate: $205,000 for the Base Bid and $20,000 for Additive Alternate No. 1
Plan Holders List: Current List
Cost of Bid Documents: Download Only
Project Description:

Work generally includes mobilization/demobilization, erosion and sediment control, demolition and disposal, clearing and grubbing, unclassified excavation, utilizing or disposing of excavated material, excavation dewatering, placement and compaction of base, subbase and usable excavated material, salvaging and placing salvaged pea gravel, importing and placing new pea gravel, adjusting existing storm and sanitary sewer structures, connecting to existing storm sewer pipes and structures, installing new storm drain pipes and structures, cleaning existing storm drain structures, construction surveying, installing filter cloth, placing topsoil and seeding, installing underdrains, asphalt concrete pavement cutting and patching, installing playground equipment footings and OWNER-provided play equipment, installing “poured-in-place” fall protection surfacing, constructing concrete walks, miscellaneous grading, and site restoration to pre-construction conditions.

Result

Low Bidder: Admiralty Construction, Inc.

Bid Opening/Proposal Date: 2021-05-25
Bid Amount: $271,500
Bid/RFP Result Summary: View Document
Award Date: 2021-06-10
Award Amount: $271,500
Notice of Award:  View Document
Bid/RFP Documents: