CDD Logo

First Street, Douglas Cul-De-Sac Construction

Bid Due Date: blank 7/1/2011

Pre-Bid Meeting:

Type of Solicitation: Bid
Bid/RFP Number: E11-293
Date Advertised: 
Construction Estimate: $70,000
Plan Holders List: Current List
Cost of Bid Documents: $30.00
Project Description:

This project consists of import and placement of 152 CY of Riprap, Class II, 820 CY of 12 inch minus shot rock and 50 CY of 2 inch minus shot rock, placement of RAP surfacing, construction of a concrete beach access ramp, installation of bollards and chain at the top of the access ramp and lengthening of a drainage culvert.

Result

Low Bidder: Arete Construction Corp.

Bid Opening/Proposal Date: 7/1/2011
Bid Amount: $43,220
Bid/RFP Result Summary: View Document
Award Date: 0000-00-00
Award Amount: 
Notice of Award: