
BRH Fuel System Upgrades
Proposal Due Date:
2022-06-28
Pre-Bid Meeting Date: 2022-05-25
Type of Solicitation: Bid
Bid/RFP Number: BE22-233
Description:
Work generally includes modification of the current BRH boiler’s fuel system, provide a fully functioning fuel supply system that is ADEC and EPA compliant.
Also, includes installation of new underground fuel oil return and fuel oil supply lines from the underground storage tank to the boiler pumps, installation of sealing manhole frames and lids, modifying the filling system to allow gravity fill directly into underground storage tank, and extending tank venting to above the roofline. Work also includes replacement of suction pumps, replacement of the boilers day tank, installation of new pump control system, and miscellaneous work.
Result
Low Bidder: Schmolck Mechanical Contractors, Inc
Bid Opening/Proposal Date: 2022-06-28
Bid Amount: $431,217.00
Bid/RFP Result Summary: View Document