Downtown Seawalk - Miner's Cove to Franklin Dock

Proposal Due Date: white pixel, space holder 8/14/2013

Pre-Bid Meeting Date: 

Type of Solicitation: Bid
Bid/RFP Number: E13-288


Description:

This Project consists of construction of an elevated marine Seawalk adjacent to the existing Miner’s Cove Building Seawalk and south past the Transfer dock to the restroom facility, including construction of steel pipe piles, splices and pile caps; pier timberwork and decking; concrete footings, retaining walls, planters and pedestals; railings; concrete sidewalk; asphalt pavement; grading, fill and storm drainage work; overhead canopy; picnic tables, benches, landscaping, sign installation; electrical utilities; the relocation of a sewer line; and other related Work.

Result

Low Bidder: North Pacific Erectors, Inc.

Bid Opening/Proposal Date: 8/14/2013
Bid Amount: $3,442,858.00
Bid/RFP Result Summary: View Document
Award Date 8/27/2013
Award Amount: $3,442,858.00
Notice of Award: View Document