Downtown Seawalk - Miner's Cove to Franklin Dock
Proposal Due Date:
8/14/2013
Pre-Bid Meeting Date:
Type of Solicitation: Bid
Bid/RFP Number: E13-288
Description:
This Project consists of construction of an elevated marine Seawalk adjacent to the existing Miner’s Cove Building Seawalk and south past the Transfer dock to the restroom facility, including construction of steel pipe piles, splices and pile caps; pier timberwork and decking; concrete footings, retaining walls, planters and pedestals; railings; concrete sidewalk; asphalt pavement; grading, fill and storm drainage work; overhead canopy; picnic tables, benches, landscaping, sign installation; electrical utilities; the relocation of a sewer line; and other related Work.
Result
Low Bidder: North Pacific Erectors, Inc.
Bid Opening/Proposal Date: 8/14/2013
Bid Amount: $3,442,858.00
Bid/RFP Result Summary: View Document