Lemon Creek Fire Hydrant

Proposal Due Date: white pixel, space holder tapped off of the 12" water pipe. The final slope shall be armored with 6""-12"" shot rock slope protection. The project will include removing and replacing approximately twenty square-feet of asphalt sidewalk"

Type of Solicitation: RFQ
Bid/RFP Number: E12-072


Description:

Contractor shall provide all labor, equipment, materials and perform all work for removal of approximately 18' of 12 water pipe and the installation of a new fire hydrant and pad. The remaining twelve inch water pipe will be capped and include the installation of a thrust block. The project will include excavation of existing valve to verify the operational condition and include the replacement of the existing valve box. The fire hydrant will be installed using a tapping saddle

Result

Low Bidder: base course and other miscellaneous related work items necessary to complete the work."

Bid Opening/Proposal Date: tapped off of the 12" water pipe. The final slope shall be armored with 6""-12"" shot rock slope protection. The project will include removing and replacing approximately twenty square-feet of asphalt sidewalk"
Bid Amount: 8/16/2011
Bid/RFP Result Summary: View Document
Award Date $17,300
Award Amount: https://juneau.org/wp-content/uploads/2019/10/20110816041306-summary.pdf
Notice of Award: View Document