Title:Juneau Hydroelectric Power Crisis Lessons-Learned Commission Report
Date Prepared:September 17, 2008
Prepared By:Lessons Learned Commission, Sally Smith Chair, Rick Edwards, Robert Martin, Jr.
Prepared For:CBJ Assembly
Version:Final
Department:Assembly
Project Category:Reports
Physical Location of the Document:Clerk
Electronic Version:2008-09-17-Lessons-Learned-Commission-Report.pdf
Comments/Summary:

This is a report on the response to the avalanche damage to the 2008 Snettisham Hydro transmission towers, which was identified as a potential economic disaster due to the increased cost of fuel to generate electricity.